M.Smithson LTD was appointed to carry out drainage excavation, utility installation and full tarmac reinstatement at a school in Marple, Stockport. The works involved excavating through an existing playground surface to install new foul drainage pipework, before reinstating the surface to match the existing finish.
The site was a live, operational school — meaning tight working windows, strict segregation between our works and pupils, and a spotless handover expected at the end of every shift. Access was constrained and the excavation ran close to existing buildings and services.
The school regained full use of the area with a seamless new surface and a modern drainage system beneath it. The job was delivered safely around the life of the school with zero incidents and minimal disruption — exactly how work on education sites should run.