Groundworks for a new classroom block beside a newly built primary school in Cambridge: setting out, topsoil strip, reduced-level dig and a full grid of pad foundations, with muck-away running to keep the programme moving. This page is a running diary — we add to it as the job moves on.

Job Diary

18 September 2026

Pad Foundations Dug

The full grid of pad and trench foundations went in to the set-out lines, with the evening muck-away wagon clearing spoil as the dig finished.

Grid of pad foundations excavated beside the new school Cambridge Foundation excavations to set-out lines Cambridge Evening muck-away with excavator loading the eight-wheeler Cambridge
16 September 2026

Strip & Reduced-Level Dig

Setting out in red paint, topsoil strip and the reduced-level dig cut to a clean rectangular formation, ready for the foundation grid.

Excavator and dumper stripping the site to formation Cambridge Excavator cutting the reduced-level dig Cambridge Completed excavation platform beside the new school Cambridge